智能电网

Vol.3 No.6 (December 2013)

基于UMM的主设备运维策略研究
Research on Operation and Maintenance Decision-Making of Main Equipment Based on UMM

 

作者:

邓世聪 , 李林发 , 黄炜昭 :深圳供电局有限公司,深圳

 

关键词:

运维策略贝叶斯网络不确定性多阶段多目标Operation Maintenance Strategy Bayesian Network UMM

 

摘要:

介绍了目前南网运维策略现状,并分析了现在运维策略中存在的弊端。针对此,本文提出了一种考虑设备全寿命周期成本,基于贝叶斯网络模型的不确定多阶段多目标运维决策模型,并给出了模型求解过程。最后通过建立GISUMM (uncertainty)运维策略模型,制定最佳的运维策略,验证所提出UMM决策模型的有效性。

In this paper the existing situation of the operation maintenance strategy of gird main equipment is presented and the problems of traditional operation maintenance strategy are analyzed. A new model based on uncertainty multi- stage and multi-object by Bayesian network is presented in this paper, which is for making operation maintenance strategy with the consideration of life cycle cost. In the end a GIS example proves the UMM model’s practical applications.

文章引用:

邓世聪 , 李林发 , 黄炜昭 (2013) 基于UMM的主设备运维策略研究。 智能电网, 3, 159-163. doi: 10.12677/SG.2013.36029

 

参考文献

分享
Top